OSSM
Assembly Guide
Assembly Guide for OSSM.
The OSSM assembly guide is awaiting migration from the current operational hardware sources.
Migration Checklist
- Confirm the release CAD exports in
hardware/cad/. - Confirm PCB source migration status in
hardware/pcb/. - Confirm Wireviz harness output from
hardware/cables/. - Populate
hardware/bom.csvwith product-level line items. - Replace this checklist with the ordered build sequence and assembly photos.
Do not invent assembly steps before the release source package is complete.