OSSM
Bill of Materials
Bill of Materials for OSSM.
The OSSM product-level BOM is generated from hardware/bom.csv
during the assembly-docs build. Update the CSV instead of editing the generated
block by hand.
The BOM is currently a header-only migration placeholder. Until product rows are added, Ohai leaves this page text intact.